  Trinity University - Northrup Hall
Owner: Trinity University
GC: Bartlett Cocke General Contractors
Acres: 4
Pad Area: 62,000 SF
Paving Area: 65,500 SF


Before Trinity University's Northrup Hall could be constructed, the demolition of the previous building and selective site demolition had to be performed, both, while classes were still in session. An existing fountain was carefully demolished because the University desired to salvage the centerpiece and re-install it in a new fountain display. Sitework activities included pad and site concrete preparations, rock excavation and extensive tree protection.
  Byron P. Steele II High School
Owner: Cibilo ISD
GC: Bartlett Cocke General Contractors
Acres: 65
Pad Area: 186,000 SF
Paving Area: 537,000 SF

The Byron P. Steele II High School project was a complete sitework job. The site had multiple areas that required grading including all sports fields and the detention pond. Severe rain delayed the project on multiple occasions demanding field crews to spend several hours pumping water to complete operations. M&M provided and placed all asphalt and select fill for the building pad.
  St. Mary's University Convocation Center
Owner: St. Mary's University
GC: Lyda
Acres: 10
Pad Area: 80,000 SF
Paving Area: 110,000 SF

This was another project utilizing both demolition and sitework services. Sitework crews installed the building pad and new parking after the existing lots were demolished. Simultaneously, demo crews took care of the demolition of the gym and weight room. M&M courteously salvaged some of the bricks for Alumni to use for fundraising.
  UTSA Downtown
Owner: University of Texas System
GC: Spaw Glass/ Centex
Acres: 3

This project consisted of the excavation and pad preparation for the entire downtown campus. Towards the end of the project a design build parking garage was added completely handled through change orders. Over 15 feet of excavation along with lagging was required in the parking garage. Because the garage was so deep, a ramp had to be dug just to deliver the select fill. All prep work for the interior courtyards was included in the scope of work.