  Gerloff Warehouse
Owner: Gerloff Company
GC: Gerloff Company
Acres: 3
Pad Area: 31,000 SF
Paving Area:
80,000 SF

The Gerloff Warehouse was a completely new facility. M&M's site services cleared the entire site before performing excavation and select fill operations. M&M provided and placed the asphalt paving while also prepping for the concrete paving.
  Kelly Flex Warehouse
Owner: Kelly USA
GC: Lyda Swinerton
Acres: 26
Pad Area: 373,000 SF
Paving Area: 280,000 SF

M&M imported over 68,000 cy of material to balance the site. More than 223,000 tons of select fill was required in the building footprint alone. Recycling operations were able to crush and screen existing pavement and slabs to keep imported fill at a minimum. Overtime was used to keep up with the 125 loads of material that were received per day. In addition to the asphalt, M&M also prepped 120,000 sf of concrete.
  Kelly Maintenance Hangar
Owner: Kelly USA
GC: The Austin Company
Acres: 4
Pad Area: 62,000 SF
Paving Area:
62,500 SF

Kelly Maintenance Hanger faced the uncontrollable weather from the 2002 flood which flooded the entire site. Nonetheless, M&M used its diversity to assist with delays. Demolition crews demolished concrete paving and buildings, while site crews tackled the building pads. Even though the project was design-build, with plans constantly changing, and the weather tremendously slowing down the project, M&M used change orders and some overtime to keep everything running smooth.